LANSCE Facility Status   Aug 27, 2026 23:59:59      Lujan    WNR     IPF
        Beam  Duty  Rate Length  Energy  Current       (μA)   (nA)    (μA)
  Lujan   ON  1.3%    20  625μs  800MeV      ?μA    23   73   1987       1
  WNR     ON  6.3%   100  625μs  800MeV    2.0μA    22   75   2029       1
  LX      ON  1.3%    20  625μs  800MeV    0.2μA    21   74   1965       1
  IPF    OFF  5.2%   100  520μs  100MeV    0.7μA    20   57   1443       1
  201        12.1%   120 1009μs                     19   10    256       1
  805         9.4%   120  784μs                     18   69   1877       1
                                                    17   54   1428       1
  Lujan Long Bunch Countdown:   1  Width:  289ns    16   19    620       1
  WNR & Line X Micropulse Spacing:     1.8 μs       15   55   1866       1
  WNR Tgt 4 Reaction Mon:            11551 cts      14   56   1770       1
                                                    13    6    718       1
                                                    12    1    442       1
                                                    11   48   1316       1
   Time of Message Update: 27-AUG-26   19:22        10    4    123       1
       IPF off  LUJAN prod  WNR prod  LX prod       09    5    170       1
           IPF down due to H+ column work           08   71   2224       1
          Estimated time of recovery: 8/27          07   72   2229       1
           Beam off due tosignificant 670kV         06   72   2238       1
         droops, Source team opening dome to        05   68   2211       1
                    investigate.                    04   72   2200       1