LANSCE Facility Status Nov 17, 2026 05:00:00 Lujan WNR IPF Beam Duty Rate Length Energy Current (μA) (nA) (μA) Lujan ON 1.3% 20 625μs 800MeV 91.0μA 04 91 720 193 WNR ON 2.5% 40 625μs 800MeV 0.7μA 03 91 717 193 LX ON 1.3% 20 625μs 800MeV 0.0μA 02 91 713 193 IPF ON 4.4% 100 440μs 100MeV 193.2μA 01 90 708 182 201 12.1% 120 1009μs 00 90 717 107 805 4.7% 60 784μs 23 90 762 195 22 89 766 189 Lujan Long Bunch Countdown: ? Width: ?ns 21 91 742 60 WNR & Line X Micropulse Spacing: 1.8 μs 20 91 730 225 WNR Tgt 4 Reaction Mon: 4725 cts 19 82 664 217 18 84 801 247 17 92 803 245 16 92 805 247 Time of Message Update: 16-NOV-26 04:12 15 92 708 247 IPF prod LUJAN prod WNR prod LX prod 14 90 12 248 IR 26-18 isin progress. 13 89 688 242 12 91 817 249 Beam ON to all areas 11 90 811 248 10 91 12 247 09 84 662 241