LANSCE Facility Status   Aug 07, 2026 21:29:59      Lujan    WNR     IPF
        Beam  Duty  Rate Length  Energy  Current       (μA)   (nA)    (μA)
  Lujan   ON  0.3%     4  625μs  800MeV      ?μA    21   46    767     227
  WNR     ON  6.3%   100  625μs  800MeV    1.5μA    20   28     10     227
  LX     OFF  0.1%     1  625μs  800MeV    0.1μA    19    0     10     225
  IPF     ON  4.8%   100  475μs  100MeV  228.3μA    18    0     10     229
  201        12.1%   120 1009μs                     17    0     10     226
  805         9.4%   120  784μs                     16    0     10     227
                                                    15    0     10     227
  Lujan Long Bunch Countdown:   1  Width:  289ns    14   36    923     227
  WNR & Line X Micropulse Spacing:     1.8 μs       13   55   1443     227
  WNR Tgt 4 Reaction Mon:             5723 cts      12   57   1480     229
                                                    11   54   1504     229
                                                    10   33     11     229
                                                    09    0     10     219
   Time of Message Update: 7-AUG-26   15:33         08    0     10     173
     IPF production  LUJAN off  WNR off  LX off     07    0     10     217
                                                    06    0     10     205
            Module 48 Arcing in Modulator           05    0    512     230
              Estimated recovery ~20:00             04    8   1245     225
                IPF IR 26-8 at 230uA                03   69   1486     228
                                                    02   72   1509     230